Case Study - rapid prototyping

Express Prototyping in the Offshore Industry
The fastest growing area within the Ambler Technologies Group is the Express Prototyping Division.
With the acquisition of new 3D rapid prototyping printing machines to produce colour prototype models for R&D or marketing use, ATL has now booked a number of exciting and challenging contracts.
| Client | Market Sector | Contract Description |
| Acergy | Oil & gas | Scale model of Acergy's newly constructed campus in Westhill Aberdeen |
| Oil & Gas | Scale model of Acergy offshore vessels | |
| Bredero Shaw | Oil & Gas | 2 Scale models of Subsea Manifolds |
| Aker Kvaerner | Oil & Gas | Models of AK Subsea Xmas Tree, one cast in Acrylic, one c/w Perspex cover |
| AVF | Audio/Visual | Prototype Audio/Visual equipment stand |
| Trelleborg | Oil & Gas | Various prototype developments and marketing models |

Case Study - Turnkey Project
Domestic Sewage Treatment Plant
Polypipe Civils Ltd UK contracted ATL to carry out a feasibility study for improving the method of manufacture of their GRP Sewage treatment components which included Tanks, Covers and Internal Baffles etc.
ATL made a comprehensive review of the existing system and recommended that the materials and method of manufacture/assembly were changed to closed mould technology, offering instant improvements in production times, quality, cost, aesthetics and reliability.
Polypipe commissioned ATL to design and manufacture new composite tooling; specify and supply the required plant plus specify, test and source all the materials; then commission the manufacturing plant and train the staff.
Summary - The project gave Polypipe
1 Significant cost savings in materials for an identical size tank.
2 Improvements in Health and Safety with reorganisation of the working environment.
3 Improved production and shorter lead times.
4 Reduced amount of shop floor area required to produce more components. |